Wedding Cost Audit
Turn scattered quotes into a full cost forecast and a payment plan you can check.
See what’s included$9.99
Illustrative artwork. Your product is a digital PDF workbook.
Make the things worth making.
Check the true cost, test a sample and plan the work before buying in bulk.
One digital PDF. Review delivery and purchase terms at checkout.
The supplies seem inexpensive, but experiments, shopping trips and unfinished boxes are taking more time and money than expected.
Couples making simple paper goods or small decorations that can be prepared and stored ahead of time.
One 24-page PDF with practical guidance, examples and reusable working pages. Complete only the parts relevant to your wedding.
A make, buy, hire or omit decision; a tested sample; a cash and time plan; and clear packing and setup instructions.
Static PDF: print or annotate using a compatible reader. No automatic calculations or interactive form fields. Editable Word files are not included in this listing.
Designed for simple paper goods and small decorations, not hazardous installations or work requiring qualified professionals.
Two actual pages from this workbook. Preview its contents and a practical worksheet before choosing.
Selected page previews only · Edition 1.0 · Source notes in the supplied workbook dated 13 October 2026
Know what you are getting before you choose your workbook.
Each product is one English-language PDF workbook, between 22 and 30 pages. It combines practical guidance, worked examples and reusable worksheets or templates. Check the individual product page for its exact page count and contents. No physical product is included.
These are static PDFs, not interactive fillable forms. Print the pages you need or annotate them in a compatible PDF reader. They do not calculate totals, schedule tasks or update records automatically. Although the guides mention a Word edition, this storefront offers only the supplied PDFs; an editable Word file is not included.
Choose one guide for $9.99 to solve a specific planning problem. The complete bundle includes all ten PDFs, 262 pages in total, for $49.99. Buying all ten individually totals $99.90, so the bundle saves $49.91—approximately 50%. Nothing physical or editable in Word is included.
They are written for couples organising their own wedding with limited professional help. You can also use them alongside a planner or coordinator. Supplier timings, venue arrangements and safety decisions still need confirmation from the people responsible.
Yes. Every product page shows its actual contents page and one selected worksheet. Open either preview to read it at a larger size. The product artwork is illustrative; these page previews show the workbook itself.
Use Buy Now to open the matching Lemon Squeezy checkout. Individual PDFs are listed at $9.99 and the complete bundle at $49.99. Review the product, currency, taxes and final total there before paying. Follow the download instructions provided with your order.
Check the currency, taxes, refund terms and seller support details on Lemon Squeezy before completing your order. Consult the product licence for permitted use. This website does not promise additional refund or usage rights.
The workbooks use adaptable planning methods and include sources or local-check notes. Some reference the US, UK, Canada, Australia, New Zealand and Ireland. Confirm local requirements and supplier terms for your event. Examples are fictional, not market prices, and the workbooks do not guarantee savings or a particular wedding outcome.